auiip.nic.in
Staff Directory
http://www.auiip.nic.in/sd.html
Officials and Staff of PMU. Officials and Staff of PIU. Consultants and Staff of PMC. Consultants and Staff of DSC. Addendum 1 for re-bidding of SWM Processing Plant at Dibrugarh regarding Revised Submission Date of Bidding Document and Opening of Bidding Document. IFB for the Bidding of SWM Procurement of Goods for Contract AUIIP/PR-1/DIB/SWM/02 in Dibrugarh. Bid document for SWM Procurement of Goods for Contract AUIIP/PR-1/DIB/SWM/02 in Dibrugarh. Bid document for Re-Bidding of Transmission Main works ...
auiip.nic.in
Assam Urban Infrastructure Investment Programme
http://www.auiip.nic.in/index.html
Invitation for Bid for Construction of Compound Wall etc. for SWM Dibrugarh project. Notice of Inviting Tender for hiring vehicles. Addendum 12 for DBO Contract of South-East Guwahati Water Supply Project. Addendum 2 for Re-bidding of SWM Processing Plant at Dibrugarh regarding Revised Submission Date of Bidding Document and Change of Employer's Name. Invitation for Expression of Interest (EoI) for Development of Urban Drainage Modeling at Guwahati and Dibrugarh. IFB for the Bidding of SWM Procurement of...
auiip.nic.in
Right To Information
http://www.auiip.nic.in/rti.html
Shri Ashutosh Aganihotri, IAS. Project Director and First Appellate Authority. Shri Bhupesh Ch. Das, ACS. Addl Project Director and State Public Information Officer. Assam Urban Infrastructure Investment Program (AUIIP). 3rd Floor, Tripti Tower, Ganeshguri, Guwahati - 781005. RTI Application Status as per RTI Act 2005. Applications Received by AUIIP by the end of June 2015. IFB for the Bidding of SWM Procurement of Goods for Contract AUIIP/PR-1/DIB/SWM/02 in Dibrugarh. Addendum 1 for Re-bidding of Transm...
auiip.nic.in
Project Performence & Management
http://www.auiip.nic.in/ppms.html
Project Performence Management System (PPMS). PPMS is a Results Based Management System for (i) Setting Project Objectives, (ii) Designing Projects, and (iii) Monitoring and Evaluating Project Performance. PPMS cover all the stages of the Project Life Cycle from Project Preparation to Project Implementation and Project Completion and it provides feedback throughout the Project Cycle. The Project Life Cycle Implementation Documents of PPMS are as follows:. Project Administration Memorandum (PAM), basis fo...
auiip.nic.in
AUIIP Business Opportunities
http://www.auiip.nic.in/bu.html
Tenders, EoIs, Addendums, Corrigendums):. Invitation for Bid (IFB)/Tender. Construction of Compound Wall, River Protection Wall, Access Road, Security Guard Room and allied works of Landfill Site at Dibrugarh. Last Date for submission of Bid:. 30th january 2017, 1400Hr (Indian Standard Time). Notice of Re-Tendering for hiring Vehicle - 31st December 2016. Addendum 12 dated 13th December 2016. Design, Build and Operate for South East Guwahati Water Supply Project. Addendum 09 dated 17th November 2016.
auiip.nic.in
Events
http://www.auiip.nic.in/events.html
Important Events (Reverse Chronological Order). ADB Contact Mission for Project 2 under the leadership of Yukiyasu Sumi, Urban Development Specialist, Project Officer of AUIIP Trance II fielded here during 18-22 July 2016. The primary object of this Mission was to review the preparedness of Trance II under AUIIP. Contract of the subproject WS02A. The primary object of this Mission was to review the Project 2 of the multitranche financing facility (MFF) of the Investment Program. Construction of DTP Drain...
auiip.nic.in
Solid Waste Management
http://www.auiip.nic.in/swm.html
The present waste collection frequency is very irregular and inadequate. Wastes are not segregated at source and are a mixture of inert, recyclable and bio-degradable matters. Assam Medical College has the only bio-medical waste treatment facility, with an incinerator of capacity 150 kilograms (kg). DMB provides facility to other health care establishment on chargeable basis. The following key issues were identified:. Need to improve collection system efficiency;. The urgent improvement needs identified ...
auiip.nic.in
Site Map
http://www.auiip.nic.in/site_map.html
Addendum 1 for re-bidding of SWM Processing Plant at Dibrugarh regarding Revised Submission Date of Bidding Document and Opening of Bidding Document. IFB for the Bidding of SWM Procurement of Goods for Contract AUIIP/PR-1/DIB/SWM/02 in Dibrugarh. Bid document for SWM Procurement of Goods for Contract AUIIP/PR-1/DIB/SWM/02 in Dibrugarh. IFB for Re-bidding Bidding of SWM 100 MT Processing Plant works for Contract AUIIP/PR-1/DIB/SWM/01B in Dibrugarh. Addendum 1 for Re-bidding of Transmission Main at Guwahati.
auiip.nic.in
Water Supply System
http://www.auiip.nic.in/wss.html
The present production capacity of 110.85 MLD, actual production of water is 73.4 MLD (66%). Out of around 74 MLD of potable water produced, 72 MLD is drawn from the river Brahmaputra and rest of about 1.5 MLD is pumped from deep tube wells installed at various locations by Guwahati Municipal Corporation (GMC). Table 1: Salient Features of the Guwahati Water Supply System. IFB for the Bidding of SWM Procurement of Goods for Contract AUIIP/PR-1/DIB/SWM/02 in Dibrugarh. Addendum 1 for Re-bidding of Transmi...
guwahatijalboard.gov.in
Guwahati Jal Board
http://www.guwahatijalboard.gov.in/tenders.html
Download -Short Notice Inviting Tender No.1 of 2016-17 (Dated:07/11/2016). Download - Addendum Number - 3 for Water Meters - Pkg-C#11(a) (Dated:21/10/2016). Download - Addendum Number - 2 - And Pre bid Queries Pkg-C#11(a) (Dated:23/09/2016). Download - Addendum Number - 1 - Invitation Proposals for Supply of Water Meters Pkg-C#11(a) (Dated:20/08/2016). Click here to Download - Meter Procurement C-11(a) (Dated : 10-August- 2016. Download Addendum Number 2 House Service Connection (HSC) Pkg-C#12(a). EOI fo...