srt251smok.blogspot.com srt251smok.blogspot.com

srt251smok.blogspot.com

Construction and structures 2

Construction and structures 2. Tuesday, June 3, 2008. Finished and handed in! I found this interesting article which sums up much of what makes him such a unique architect, I found it at: http:/ www.esquire.com/blogs/cube/santiago-calatrava-video. The model detail I'm working on is of a section through the floor on a two storey office building. It includes, a suspended ceiling, bondex slab, I-beams and glass paneling. Stamped Concrete Videos Decorative Concrete Video. Friday, May 30, 2008.

http://srt251smok.blogspot.com/

WEBSITE DETAILS
SEO
PAGES
SIMILAR SITES

TRAFFIC RANK FOR SRT251SMOK.BLOGSPOT.COM

TODAY'S RATING

>1,000,000

TRAFFIC RANK - AVERAGE PER MONTH

BEST MONTH

October

AVERAGE PER DAY Of THE WEEK

HIGHEST TRAFFIC ON

Saturday

TRAFFIC BY CITY

CUSTOMER REVIEWS

Average Rating: 4.6 out of 5 with 9 reviews
5 star
6
4 star
2
3 star
1
2 star
0
1 star
0

Hey there! Start your review of srt251smok.blogspot.com

AVERAGE USER RATING

Write a Review

WEBSITE PREVIEW

Desktop Preview Tablet Preview Mobile Preview

LOAD TIME

0.2 seconds

FAVICON PREVIEW

  • srt251smok.blogspot.com

    16x16

  • srt251smok.blogspot.com

    32x32

  • srt251smok.blogspot.com

    64x64

  • srt251smok.blogspot.com

    128x128

CONTACTS AT SRT251SMOK.BLOGSPOT.COM

Login

TO VIEW CONTACTS

Remove Contacts

FOR PRIVACY ISSUES

CONTENT

SCORE

6.2

PAGE TITLE
Construction and structures 2 | srt251smok.blogspot.com Reviews
<META>
DESCRIPTION
Construction and structures 2. Tuesday, June 3, 2008. Finished and handed in! I found this interesting article which sums up much of what makes him such a unique architect, I found it at: http:/ www.esquire.com/blogs/cube/santiago-calatrava-video. The model detail I'm working on is of a section through the floor on a two storey office building. It includes, a suspended ceiling, bondex slab, I-beams and glass paneling. Stamped Concrete Videos Decorative Concrete Video. Friday, May 30, 2008.
<META>
KEYWORDS
1 posted by
2 1 comment
3 santiago calatrava
4 no comments
5 model in progress
6 wwwyoutube.com/watch
7 major assignment research
8 termites
9 earthquakes
10 mold
CONTENT
Page content here
KEYWORDS ON
PAGE
posted by,1 comment,santiago calatrava,no comments,model in progress,wwwyoutube.com/watch,major assignment research,termites,earthquakes,mold,v=a9iaiewdukk#,older posts,blog archive,about me
SERVER
GSE
CONTENT-TYPE
utf-8
GOOGLE PREVIEW

Construction and structures 2 | srt251smok.blogspot.com Reviews

https://srt251smok.blogspot.com

Construction and structures 2. Tuesday, June 3, 2008. Finished and handed in! I found this interesting article which sums up much of what makes him such a unique architect, I found it at: http:/ www.esquire.com/blogs/cube/santiago-calatrava-video. The model detail I'm working on is of a section through the floor on a two storey office building. It includes, a suspended ceiling, bondex slab, I-beams and glass paneling. Stamped Concrete Videos Decorative Concrete Video. Friday, May 30, 2008.

INTERNAL PAGES

srt251smok.blogspot.com srt251smok.blogspot.com
1

Construction and structures 2: June 2008

http://www.srt251smok.blogspot.com/2008_06_01_archive.html

Construction and structures 2. Tuesday, June 3, 2008. Finished and handed in! I found this interesting article which sums up much of what makes him such a unique architect, I found it at: http:/ www.esquire.com/blogs/cube/santiago-calatrava-video. The model detail I'm working on is of a section through the floor on a two storey office building. It includes, a suspended ceiling, bondex slab, I-beams and glass paneling. Stamped Concrete Videos Decorative Concrete Video. Subscribe to: Posts (Atom).

2

Construction and structures 2: Two storey office block- section at column (tute 6)

http://www.srt251smok.blogspot.com/2008/06/two-storey-office-block-section-at.html

Construction and structures 2. Tuesday, June 3, 2008. Two storey office block- section at column (tute 6). This is obviously late being put up but I've had difficulties uploading it. Subscribe to: Post Comments (Atom). Finished and handed in! Stamped Concrete Videos Decorative Concrete Video. Two storey office block- section at column (tute 6. View my complete profile.

3

Construction and structures 2: Stamped Concrete Videos Decorative Concrete Video

http://www.srt251smok.blogspot.com/2008/06/stamped-concrete-videos-decorative.html

Construction and structures 2. Tuesday, June 3, 2008. Stamped Concrete Videos Decorative Concrete Video. Subscribe to: Post Comments (Atom). Finished and handed in! Stamped Concrete Videos Decorative Concrete Video. Two storey office block- section at column (tute 6. View my complete profile.

4

Construction and structures 2: April 2008

http://www.srt251smok.blogspot.com/2008_04_01_archive.html

Construction and structures 2. Tuesday, April 29, 2008. The Herald Sun (April 27)- $150 Million Facelift. This is a new development in the grounds of Brauer College in Warrnambool, situated on Caramut road. Unfortunately I wasn't home to capture when the pre-cast panels went up in the background but was able to take photos of the portal frame. Edit: These pictures were taken on April 27. Wednesday, April 23, 2008. TAC building- Brougham Street. Edit: These photos were taken on April 23rd. Pre-cast concre...

5

Construction and structures 2: May 2008

http://www.srt251smok.blogspot.com/2008_05_01_archive.html

Construction and structures 2. Friday, May 30, 2008. No Problem with a Steel Frame. Tuesday, May 20, 2008. Burning issue for structural steel. Edit:Rakic, John Steel Australia, December 2007, vol.20, no.4, Burning issue for structural steel, pg 34. Thursday, May 8, 2008. Some of the buildings of Calatrava's we looked at include:. Liege Guillemins TGV station. BCE place- this was a building that i liked a lot. Wednesday, May 7, 2008. Tuesday, May 6, 2008. Steel bracing is used to tie the building together...

UPGRADE TO PREMIUM TO VIEW 5 MORE

TOTAL PAGES IN THIS WEBSITE

10

LINKS TO THIS WEBSITE

srt251arsa.blogspot.com srt251arsa.blogspot.com

Construction and Structures 2: Site 2: Doherty's Road Laverton

http://srt251arsa.blogspot.com/2008/05/site-2-commercial-building-in-laverton.html

Construction and Structures 2. Sunday, May 4, 2008. Site 2: Doherty's Road Laverton. This building has internal stanchions supporting the structure due to its large span. I think its interesting how the stanchion is not embedded into the the concrete slab. Could this be because the height of the stanchion is so tall, further fixings such as bolts and welding need to be done before concrete is filled into the space in order to increase its overall stability? 2A - 2008 - Angela Saliba.

srt251arsa.blogspot.com srt251arsa.blogspot.com

Construction and Structures 2: April 2008

http://srt251arsa.blogspot.com/2008_04_01_archive.html

Construction and Structures 2. Sunday, April 27, 2008. Article 7: BlueScope Steel Case Study 2. Steel Decking A Money Saver At Morayfield. Http:/ www.bluescopesteel.com.au/go/case-study/steel-decking-a-money-saver-at-morayfield. This case study is very similar to the previous case study, but it talks about the benefits of a different steel product for a different form of construction. In this case, focus is placed on steel formwork. And its huge money savings. Project Size: 20,000 square metre extensions.

srt251arsa.blogspot.com srt251arsa.blogspot.com

Construction and Structures 2: MAJOR PROJECT POSTERS

http://srt251arsa.blogspot.com/2008/06/major-project-posters.html

Construction and Structures 2. Tuesday, June 3, 2008. CONCRETE PANEL CONNECTED TO SUSPENDED CONCRETE FLOOR. 2A - 2008 - Angela Saliba. Subscribe to: Post Comments (Atom). 2A - 2008 - Angela Saliba. View my complete profile.

srt251arsa.blogspot.com srt251arsa.blogspot.com

Construction and Structures 2: March 2008

http://srt251arsa.blogspot.com/2008_03_01_archive.html

Construction and Structures 2. Friday, March 21, 2008. Tutorial Excericise 3: Portal Frame Detail. 2A - 2008 - Angela Saliba. Tuesday, March 18, 2008. Tutorial Excercise 2: Portal Frame Detail. 2A - 2008 - Angela Saliba. Tuesday, March 11, 2008. Tutorial Excercise 1: Commercial Building Annalysis. Picture One: Exterior of Building. Element: Structural Universal Beam/Column. This picture shows the internal structure or Portal Frame of Spotlight Australia. The Portal Frame structure is very important as it:.

srt251arsa.blogspot.com srt251arsa.blogspot.com

Construction and Structures 2: June 2008

http://srt251arsa.blogspot.com/2008_06_01_archive.html

Construction and Structures 2. Tuesday, June 3, 2008. CONCRETE PANEL CONNECTED TO SUSPENDED CONCRETE FLOOR. 2A - 2008 - Angela Saliba. Subscribe to: Posts (Atom). 2A - 2008 - Angela Saliba. View my complete profile.

srt251arsa.blogspot.com srt251arsa.blogspot.com

Construction and Structures 2: Site 4: Deakin University Extension Geelong

http://srt251arsa.blogspot.com/2008/05/site-4-deakin-university-extension.html

Construction and Structures 2. Sunday, May 4, 2008. Site 4: Deakin University Extension Geelong. The stanchion is coated with a special white fire resistant enamel/paint. To further increase the stability. This image shows temporary props fixed to a concrete column. I thought this was an interesting image, as it appears that a pad footing is embedded into the walling/brickwork. 2A - 2008 - Angela Saliba. Its good to see how the connections of the steelwork are extensively covered in your images, good work.

srt251arsa.blogspot.com srt251arsa.blogspot.com

Construction and Structures 2: May 2008

http://srt251arsa.blogspot.com/2008_05_01_archive.html

Construction and Structures 2. Sunday, May 4, 2008. Site 4: Deakin University Extension Geelong. The stanchion is coated with a special white fire resistant enamel/paint. To further increase the stability. This image shows temporary props fixed to a concrete column. I thought this was an interesting image, as it appears that a pad footing is embedded into the walling/brickwork. 2A - 2008 - Angela Saliba. Site 3: Geringhap Street Geelong. Cast Concrete Panels with suspended Concrete Floors. These fixings ...

srt251arsa.blogspot.com srt251arsa.blogspot.com

Construction and Structures 2: Site 1: Doherty's Road Laverton

http://srt251arsa.blogspot.com/2008/05/site-1-commercial-building-in.html

Construction and Structures 2. Sunday, May 4, 2008. Site 1: Doherty's Road Laverton. Boxing for Tilt-Up Panels are. Arranged. (Corner/Angle Bars). Steel Reinforcement for Panels. Triangular Steel supports stabilising the wooden boxing. Steel Reinforcement positioned and ready for Concrete Pour. Blue connections act as a connection that allows the panel to be lifted (furruls). Sheet mesh, bar-chairs, and corner/angle bars. The gaps in the concrete are designed to firmly place the tilt-up panels. The left ...

srt251arsa.blogspot.com srt251arsa.blogspot.com

Construction and Structures 2: Site 3: Geringhap Street Geelong

http://srt251arsa.blogspot.com/2008/05/site-3-geringhap-street-geelong.html

Construction and Structures 2. Sunday, May 4, 2008. Site 3: Geringhap Street Geelong. Cast Concrete Panels with suspended Concrete Floors. Temporary rails for safety. For suspended concrete flooring. Protruding steel under panels to stabilise, hold them in place, and easily position them. May be used to lift the panels( Connects. Square column with exposed steel reinforcement. Too connect the roof materials, ceiling or next suspended. Concrete floor to the column. 2A - 2008 - Angela Saliba.

UPGRADE TO PREMIUM TO VIEW 1 MORE

TOTAL LINKS TO THIS WEBSITE

10

OTHER SITES

srt251nhal.blogspot.com srt251nhal.blogspot.com

noelle

Tuesday, June 3, 2008. Beautifull building but, Structurally and from. The construction view I'd like to know how this is built. It's one of the tute sketches. But i played around with it . Monday, June 2, 2008. I was in paris a while ago and took some. Photos of the beautifull tower with the. The good old black and white days of construction! Beautifull image from the sixth floor of the new deakin building. Subscribe to: Posts (Atom). Deakin uni site tour. View my complete profile.

srt251nrca.blogspot.com srt251nrca.blogspot.com

Nick's Construction Blog

Sunday, May 27, 2007. Completed Model as part of Major Project for SRT251 Construction and Structures 2. Details designed in the manner of Glenn Murcutt. 5mx5mx5m section of the office/showroom building. Steel primary structure, collumns and rafters. Timber secondary structural elements such as purlins and girts. Timber floor frame. Corrugated steel cladding and roofing. Detail of the knee joint showing the circular hollow section collumns and curved steel rafters complete with haunching. Typical portal ...

srt251nta.blogspot.com srt251nta.blogspot.com

Construction & Structures 2

The Topkapi Palace in Istanbul, Turkey. The Imperial Gate to the Palace. One of the buildings situated within the Palace walls. The wide eaves are to note with the extravagent detailing in the Islamic style. Note the geometric shapes used for decoration, geometry is an important part of Islamic Architecture. The entrance to the Harem quarters within the Palace, which faces the Golden Horn in the Bosphorus. The rich detailing of the entrance to one of the seperate buildings within the Palace. The cube is ...

srt251ocs.blogspot.com srt251ocs.blogspot.com

SRT251 Reflective Digital Folio : Olivia Stafford

SRT251 Reflective Digital Folio : Olivia Stafford. Major Assignment - Poster. Major Assignment - Physical Model Complete! Here are photos of the completed model:. I cut away at the first floor wall on one side to continue with the cut made by the bearer to show the reo connection. The grey material is supposed to represent asphalt. The box gutter should have a 1:200 slope. The roof should also have a slight slope of 2-3 degrees so that the water doesn't puddle but flows to the gutter. I needed to shorten...

srt251osb.blogspot.com srt251osb.blogspot.com

AFRILOG CONSTRUCTION, KENYA

AFRILOG CONSTRUCTION, KENYA. Yo J, I think you would be definetely down with this Brand new- MHS Aluminum Building Technology. Miracles of modern engineering. The construction of the Burj al arab from January 2005 till September 2006 with music of my favourite musicians Tiësto. I found this video extremely hilarious but quite good for the pocket in terms of budget it is about how to construct a papcrete tilt up construction in 10 minutes. Has often been praised for the "elegant formalism" of his works.

srt251smok.blogspot.com srt251smok.blogspot.com

Construction and structures 2

Construction and structures 2. Tuesday, June 3, 2008. Finished and handed in! I found this interesting article which sums up much of what makes him such a unique architect, I found it at: http:/ www.esquire.com/blogs/cube/santiago-calatrava-video. The model detail I'm working on is of a section through the floor on a two storey office building. It includes, a suspended ceiling, bondex slab, I-beams and glass paneling. Stamped Concrete Videos Decorative Concrete Video. Friday, May 30, 2008.

srt251spho.blogspot.com srt251spho.blogspot.com

SRT251-2008-Steve-Horman

Tuesday, June 3, 2008. Site Visit VI: (St John of God Medical Centre [under construction]). St John of God Medical Centre. Architect: Billard Leece Partnership. Builders: Umow Lai and Associates. This shows the entire base of the building. It appears to be a mix of pre-cast and in situ poured reinforced concrete. If the temporary bracing was removed, you never know what could happen. Maybe even this:. This image shows a couple of things. Just look at the amount of reinforcement in this wall! This is a gr...

srt251tbui.blogspot.com srt251tbui.blogspot.com

Trish's

Tuesday, June 3, 2008. Above is an early plan of my detail. Here's how it turned out. Tuesday, May 27, 2008. For the 1:1 detail, i think i have researched enough of hollowcore floor plank technology to feel comfortable with modelling it at life size. there are several options. This shows a pre-cast concrete beam with reinforced concrete column. The beam is shaped in a way to allow appropriate bearing for the floor planks. The construction office was very helpful in letting me access documentation drawing...

srt251tmak.blogspot.com srt251tmak.blogspot.com

SRT251 tmak 2008

Tuesday, June 3, 2008. Construction Industry News and Articles. Thu, 13 Sep 2007 07:01 PM PST. David Ritter Building Accepts Requirements for Building Green Homes. Fri, 23 Mar 2007, 10:30 PST. The seminar reinforced the way that David Ritter Building builds homes. Many of the requirements for building a green home already come standard for the company," continues David Ritter. Portal Frame Connection with the footing. This building is a portal frame school gym located in Melton. The building is compr...

srt251wkho.blogspot.com srt251wkho.blogspot.com

Will Hosikian

Week 13 and 14 major project. Final model and details. Perlins , beams and haunching. 250mm hollow core slab to office. Glazing with external face plate fized past the glass to the secondary structure. 1000 x 1000 x 1000 pad footing. Complete model front view. Complete model front view. Secondary structure UB/ UC support framework for expressed window mullion. Primary structure UB/ UC. Week 11 and 12 further developing the final model. Week 9 and 10. The project also received a $20 million donation from.

srt2ep.ung731.www.mj9t4.nr3vl.593647685.cn srt2ep.ung731.www.mj9t4.nr3vl.593647685.cn

海口半永久纹绣培训_上海长宁半永久培训多少钱_嘉兴半永久化妆培训学院_哈尔滨纹眉学校

海口半永久纹绣培训 上海长宁半永久培训多少钱 嘉兴半永久化妆培训学院 哈尔滨纹眉学校. Designed and built By sir.G.